Why does estimate have to be a drop down
-
Why must the estimate be a dropdown in which all the values must be pre-set in settings? It would be far easier if the Estimate field were an editable field like the project and task fields on the board itself.
Thanks
Viewing 1 replies (of 1 total)
Viewing 1 replies (of 1 total)
- The topic ‘Why does estimate have to be a drop down’ is closed to new replies.