Manually change order of posts
-
How can i go back after multiple posts have been made and change the order? ie make one that is older at the top of the posts?
Thanks
Viewing 2 replies - 1 through 2 (of 2 total)
Viewing 2 replies - 1 through 2 (of 2 total)
- The topic ‘Manually change order of posts’ is closed to new replies.