ICS Imports
-
When importing “All Day” events (12:00 AM – 12:00 AM) the End Date is always the day before the Start Date. I have had to manually change every end date. This is very time consuming. Is there any other way to import these events without having to manually change every one of them? I am importing into Timely’s All-in-One Event Calendar.
The page I need help with: [log in to see the link]
Viewing 1 replies (of 1 total)
Viewing 1 replies (of 1 total)
- The topic ‘ICS Imports’ is closed to new replies.