Date Issue
-
My Website is set to use the date format d/m/y (as this is standard in the UK) in wordpress general settings.
When adding a new signup sheet I can click on the date field and select a date in the interactive calendar.
This puts the date in the field in the d/m/y format however if I click save the page refreshes and the date defaults to 01/01/1970.
If I manually type the date in in m/d/y format and press save everything works fine (but obviously I cant use the interactive calendar to do this).
On the sign-in sheet page the date shows correctly as d/m/y even when entered on the creation page as m/d/y.
Is this something that can be fixed as it is very confusing?
Viewing 1 replies (of 1 total)
Viewing 1 replies (of 1 total)
- The topic ‘Date Issue’ is closed to new replies.