• Hi,
    I don’t need a plug-in. Instead I’d like to have the order status showing as processing instead of on-hold for all orders placed. Is there any code I can change?

    Thanks in advance!
    Sandy

    The page I need help with: [log in to see the link]

Viewing 3 replies - 1 through 3 (of 3 total)
Viewing 3 replies - 1 through 3 (of 3 total)
  • The topic ‘Change order status from on-hold to processing – code needed’ is closed to new replies.