Viewing 1 replies (of 1 total)
  • Plugin Author cyberduck

    (@cyberduck)

    Two ways to change the order of The buttons.

    1. Change the publish date of the button. The latest published will be the last in the row.
    2. Install the excellent plugin Post Type Reorder. Then you will get the option to reorder the buttons (and also all your other post type posts) with a neat drag and drop interface.

Viewing 1 replies (of 1 total)
  • The topic ‘Change order of buttons displayed’ is closed to new replies.