change order of blocks
-
Yesterday I created a basic blog post using the Blocksy theme with some images floating left and some right. But I noticed that in the mobile view that the images did not appear under the correct paragraph. It was suggested that I try out the Generate Blocks plugin so that I could change the order of the blocks in mobile view.
I am testing it now so I don’t have a url but I can’t get the desired effect. For my test I put each paragraph in a separate container and put the image in another container set to float left. When I view it on mobile it appears above the paragraph when I would rather it appear below. I tried changing the order of the blocks as shown in this post but my guess is I am missing something since it doesn’t change anything. Any help would be great.
The page I need help with: [log in to see the link]
- The topic ‘change order of blocks’ is closed to new replies.