• Hi,

    I want to show the gallery in reverse order – latest first. It is only possibly to add a new image to the end of the gallery items rather than at the start, so I have to manually drag them to the top before saving. We have added over 200 images to one page, hence it gets quite time consuming and fiddly adding images. I wondered if there is any way to add a filter or something to my child theme to change the order to descending.

    Many thanks.

    • This topic was modified 7 years, 1 month ago by kworrall.
    • This topic was modified 7 years, 1 month ago by kworrall.

    The page I need help with: [log in to see the link]

  • The topic ‘Can I change order of gallery items?’ is closed to new replies.