Editing Multi-Day Events with Blocks enabled changes end-date / Bug
-
Hi,
if i want to edit something in an existing multiday-event, the end date jumps automatically 3 days into future. Its annoying to edit that every time again while creating events… it depends on the setting Gutenberg-Blocks enabled. Tested with a fresh installed WordPress 5.1.1 & newest tribe-events-calendar Plugin 4.9.0.3 with twentynineteen-theme.
Hope to get this fixed soon, thanks in Advance,
Jan
Viewing 1 replies (of 1 total)
Viewing 1 replies (of 1 total)
- The topic ‘Editing Multi-Day Events with Blocks enabled changes end-date / Bug’ is closed to new replies.